CITY OF
May 27, 2008
PRESENT: D.
Seeley Hubbard, Chair (6:25 pm); Anne Cagnina; Ed Holowinko; Gwen Briggs;
Elizabeth Ackerman; Emily Wilson; Andrew Kydes; Chris Handrinos (6:25 pm);
Karen Destefanis (6:30 pm)
STAFF: Alexis
Cherichetti; Yari Bletsas
OTHERS: Attorney
Elizabeth Suchy; Tom Nelson, McChord Engineering Inc.; Leslie Lawrence
I.
CALL TO
ORDER
In Mr. Hubbard’s absence, Ms. Cagnina
acted as Chair. She called the meeting
to order at 6:02 pm.
II.
ROLL
CALL
Ms. Cherichetti called the roll.
III.
PERMIT
MODIFICATION OR EXTENSION
a)
#S07-279A—
Ms. Cherichetti described the condition
of the rear yard. She stated that during
implementation of the previously permitted regulated activities, remnants of a
pipe were found on the property. New
pipe was then installed at the site without a permit. The Commission discussed details about the
pipe.
** MS. WILSON MOVED TO ADOPT THE FOLLOWING RESOLUTION:
WHEREAS, THE CONSERVATION COMMISSION HAS CAREFULLY
CONSIDERED ALL THE INFORMATION SUBMITTED AND THE FACTORS FOR
CONSIDERATION OF DECISION, AS DETAILED IN SECTION 60A-8 OF
WHEREAS, THE PROPOSED ACTIVITIES, INCLUDING THE
RECONNECTION OF THE SOLID PIPE, WILL NOT LIKELY CAUSE ANY FURTHER NEGATIVE
IMPACTS TO THE WETLAND;
NOW THEREFORE BE IT
RESOLVED:
THAT CONSERVATION
APPLICATION #S07-279A, FOR MODIFICATION OF PERMIT #S07-279 TO ALLOW
INSTALLATION OF A DRAINAGE PIPE AND REDUCTION OF REQUIRED PLANTINGS IN AND
ADJACENT TO A WETLAND, BE GRANTED TO KATHLEEN MCCARTHY AND MATTHEW SANCHEZ, FOR
PROPERTY AT 15 CRANBURY WOODS ROAD, NORWALK, CT [5-32-7], WITH THE FOLLOWING
CONDITIONS:
1. PRIOR TO COMMENCEMENT OF
ANY ON-SITE PERMIT RELATED ACTIVITY, THE APPLICANT SHALL PROVIDE PHOTO
DOCUMENTATION OF THE SITE AND CROSS-REFERENCE THE PHOTOGRAPHS ON A SITE
PLAN. PHOTOGRAPHS SHOULD REPRESENT
WIDE-ANGLE VIEWS.
2. A $2,000.00 PERFORMANCE BOND IS TO BE POSTED PRIOR TO THE COMMENCEMENT
OF ANY ON-SITE ACTIVITY. THE BOND SHALL
BECOME ELIGIBLE FOR RELEASE FOLLOWING AT LEAST TWO (2) FULL GROWING SEASONS,
AFTER THE SEASON OF INITIAL PLANTING. A
GROWING SEASON EXTENDS FROM MAY 15 THROUGH OCTOBER 15 OF ANY GIVEN YEAR.
3. SITE GRADING SHALL BE
LIMITED TO ONLY AROUND THE IMMEDIATE VICINITY OF AREAS NOTED ON SUBMITTED PLANS
TO BE RE-GRADED. OTHER AREAS IN AND
ADJACENT TO THE WETLAND SHALL NOT BE GRADED UNLESS SPECIFICALLY PERMITTED OR CONDITIONED
BY THIS PERMIT.
4. A WETLAND BUFFER AREA SHALL
BE ESTABLISHED TO THE WEST OF THE PROPOSED DRY STREAM CHANNEL. THE BUFFER AREA SHALL EXTEND ACROSS REAR AND
NORTHERN SIDE YARDS, AS DEPICTED ON THE PLAN ENTITLED, “REVISED PLANTING PLAN, M. SANCHEZ & K. MCCARTHY, 15 CRANBURY
WOODS ROAD, NORWALK, CONNECTICUT”, DATED MAY
1, 2008 BY ENVIRONMENTAL LAND SOLUTIONS, LLC. THE BUFFER AREA SHALL BE PLANTED WITH THE
PLANTING PLAN DESCRIBED ON THE ABOVE-MENTIONED PLAN WITHIN SIX (6) MONTHS OF
INITIATING GRADING AND DRAINAGE IMPROVEMENTS TO THE PROPERTY. THE AREA WITHIN THE PROPOSED WETLAND BUFFER
AREA SHALL BE MAINTAINED IN SUCH A MANNER THAT ALLOWS THIS AREA TO ESTABLISH A
NATURAL VEGETATED STATE; THESE AREAS SHALL NOT BE MAINTAINED AS LAWN.
5. THOUGH THIS PERMIT EXPIRES
IN TWO (2) YEARS, ALL ACTIVITY MUST BE COMPLETED WITHIN EIGHT (8) MONTHS OF THE
COMMENCEMENT OF ACTIVITY.
6. ANY CHANGE TO THE OVERALL
PLAN, AS DEPICTED IN THE SUBMITTED PLANS AND NARRATIVES, WILL REQUIRE A RETURN
TO THE CONSERVATION COMMISSION FOR REVIEW.
** MS. BRIGGS SECONDED.
** MOTION PASSED UNANIMOUSLY.
b)
#S03-148A—
Ms. Cherichetti explained that the applicant
had been granted a permit in June, 2003 and that the applicant was seeking a 5
year permit extension. Ms. Cagnina asked
why the applicant needed a five-year, as opposed to a 3-year extension. Attorney Suchy explained that the applicant
does not want the permit to expire and is agreeable to modification of the time
frame. The Commission asks about the
details of the site plan.
** MS. WILSON MOVED TO ADOPT THE FOLLOWING RESOLUTION:
WHEREAS, CLEARING AND
GRADING WORK HAS ALREADY COMMENCED ON THE PROPERTY; AND
WHEREAS, THIS WORK IS
IMMEDIATELY UPHILL OF TWO WETLANDS;
NOW THEREFORE BE IT
RESOLVED:
THAT THE REQUEST FOR EXTENSION AND MODIFICATION OF PERMIT #S03-148 BE GRANTED
WITH THE FOLLOWING TERMS:
1) THE PERMIT EXPIRATION DATE
SHALL BE EXTENDED THREE (3) ADDITIONAL YEARS (TO JUNE 10, 2011).
2) SPECIAL CONDITION # 9 SHALL
BE MODIFIED TO READ, "ONCE WORK ON THE PROJECT COMMENCES, ALL ACTIVITY
UNDER THIS PERMIT IS TO BE COMPLETED WITHIN FOUR AND A HALF (4 1/2) YEARS OR
JUNE 10, 2011, WHICHEVER IS EARLIER."
** MR. KYDES SECONDED.
** MOTION PASSED UNANIMOUSLY.
c)
#S07-269A—20
Betmarlea Road—McGettigan—Modification of permit to not be required, as
initially proposed, to remove existing shed away from wetland and install
buffer plantings
Mr. Hubbard, Mr. Handrinos, and Ms.
Destefanis arrived. Mr. Hubbard resumed
as Chair.
Ms. Cherichetti described the
application, stating that there is a wetland along the eastern side yard of the
property and that the applicant did not want to move the existing shed. Ms. Cherichetti explained that in the original
permit application, which requested sought the construction of a new garage,
the owners had proposed removal of two sheds as a wetland impact mitigation
measure. There was a brief discussion
about changes to the shed, as well as the applicant’s reasons for wanting the
shed to remain where it was. Mr. Hubbard
stated that the best solution would be to move the shed to another location.
The Commission agreed to table this
item until the next meeting and requested that staff contact the applicants and
invited them to attend the next meeting.
The Commission agreed to continue along
in the agenda, but would suspend the order of the agenda at 7:00 pm to commence
the public hearing.
IV.
DISCUSSION AND/OR DECISION
a)
#
** MS. CAGNINA MOVED TO APPROVE TO APPLICATION.
** MS. DESTEFANIS SECONDED THE MOTION.
Following
discussion of the application and the draft resolution, Ms. Cagnina withdrew
her motion.
** MS. DESTEFANIS MOVED TO ADOPT THE FOLLOWING RESOLUTION:
WHEREAS, THE
CONSERVATION COMMISSION HAS CAREFULLY CONSIDERED ALL THE INFORMATION SUBMITTED
AND THE FACTORS FOR CONSIDERATION OF DECISION, AS DETAILED IN SECTION
60A-8 OF
WHEREAS, THE
PROPOSED ACTIVITIES, AS CONDITIONED BELOW, WILL LIKELY MITIGATE THE NEGATIVE
IMPACTS ON THE WETLAND OR WATERCOURSE THAT RESULTED FROM THE PREVIOUS
NON-PERMITTED ACTIVITIES;
WHEREAS, THE FULL
NOW THEREFORE BE IT RESOLVED:
THAT CONSERVATION APPLICATION #S08-307, FOR
CORRECTIVE RESTORATION AND LANDSCAPING IN AND ADJACENT TO A WETLAND AND
WATERCOURSE, BE GRANTED TO CLEMENT
AND EILEEN BRANCALE, FOR THE PROPERTY AT 111 MAYWOOD ROAD, NORWALK, CT
[5-62-168], WITH THE FOLLOWING CONDITIONS:
1. A $700.00 BOND IS TO BE POSTED
PRIOR TO RE-COMMENCEMENT OF ANY ON-SITE PERMIT RELATED ACTIVITY. THE BOND SHALL BECOME ELIGIBLE FOR RELEASE
FOLLOWING AT LEAST TWO (2) FULL GROWING SEASONS AFTER THE SEASON OF INITIAL
PLANTING. A GROWING SEASON EXTENDS FROM
MAY 15 THROUGH OCTOBER 15 OF ANY GIVEN YEAR.
ALL SPECIAL CONDITIONS OF THE PERMIT MUST BE SATISFIED PRIOR TO RELEASE
OF THE BOND.
2. THE PLANTING PLAN, AS
DEPICTED IN THE PLAN ATTACHED TO THE NARRATIVE RECEIVED APRIL 18, 2008, BY
CLEMENT BRANCALE, SHALL BE FULLY IMPLEMENTED WITHIN ONE (1) MONTH OF THE
ISSUANCE OF THIS PERMIT. THE SHRUBS SHALL BE NATIVE TO
3. ANY OTHER REGULATED
ACTIVITIES WITHIN THE
** MS. ACKERMAN SECONDED.
** MOTION PASSED WITH 5 IN FAVOR AND 2 ABSTENTIONS (MS. CAGNINA
AND MR. HANDRINOS).
b)
#S08-312—Rowayton
Woods Drive—Organic Designs, LLC—Pond rehabilitation and drainage improvements
in and adjacent to a wetland and watercourse
Discussion of this item was tabled
until following the close of the scheduled public hearing.
c)
#S08-313—25
Noah’s Lane—City of
** MS. DESTEFANIS MOVED TO ADOPT THE
FOLLOWING RESOLUTION:
WHEREAS, THE CONSERVATION COMMISSION HAS CAREFULLY
CONSIDERED ALL THE INFORMATION SUBMITTED AND THE FACTORS FOR
CONSIDERATION OF DECISION, AS DETAILED IN SECTION 60A-8 OF
WHEREAS, THE PROPOSED ACTIVITIES ARE NOT LIKELY TO
RESULT IN NEGATIVE IMPACTS TO ANY WETLAND OR WATERCOURSE;
NOW THEREFORE BE IT RESOLVED:
THAT CONSERVATION APPLICATION #S08-313, FOR
INSTALLATION OF A HEADWALL AND DRAINAGE PIPE IN AND ADJACENT TO A WATERCOURSE,
BE GRANTED TO THE CITY OF NORWALK DEPARTMENT OF PUBLIC WORKS, FOR WORK IN THE
VICINITY OF 25 NOAH’S LANE, NORWALK, CT [5-26-105], WITH THE FOLLOWING
CONDITIONS:
1.
ACTIVITIES WITHIN THE WATERCOURSE, INCLUDING CONSTRUCTION OF
THE HEADWALL AND CLEANING OF THE STONE-LINED CHANNEL, SHALL BE LIMITED TO OCCUR
DURING THE GENERALLY LOW FLOW CONDITIONS BETWEEN JULY 1 THROUGH SEPTEMBER 30 OF
ANY GIVEN CALENDAR YEAR.
2.
ANY OTHER REGULATED ACTIVITIES WITHIN THE
** MS. CAGNINA SECONDED.
** MOTION PASSED WITH 6 IN FAVOR AND ONE
ABSTENTION (MS. ACKERMAN).
d)
#S08-314—7,8
& 9 Meadowbrook Lane; 6,8 & 11 Fullmar Lane; 9 &
Ms. Cherichetti stated that the
applicant was in the process of having the wetlands delineated by a soil
scientist and that this item should be deferred until next month.
e)
#
Ms. Ackerman and Mr. Hubbard recused
themselves and left the room.
Ms. Destefanis asked if this were a new
permit. Ms. Cherichetti responded that,
technically, yes, this was a new permit. She also noted
that the application was effectively the same as it was seeking to finish the
exact same work that had been approved under #S05-215, which had expired. The Commission discussed the conditions in
the item’s draft resolution.
** MR. KYDES MOVED TO APPROVE THE
FOLLOWING RESOLUTION:
WHEREAS, THE CONSERVATION COMMISSION HAS CAREFULLY
CONSIDERED ALL THE INFORMATION SUBMITTED AND THE FACTORS FOR
CONSIDERATION OF DECISION, AS DETAILED IN SECTION 60A-8 OF
WHEREAS, THE PROPOSED ACTIVITIES HAVE PREVIOUSLY BEEN
APPROVED UNDER CONSERVATION PERMIT #S05-212 & #S05-202A AND THESE PERMITS
HAVE EXPIRED; AND
WHEREAS, PERMIT #S05-202 & #S05-202A WAS APPROVED WITH
CONDITIONS AND SOME OF THESE REQUIRED CONDITIONS HAVE NOT YET BEEN IMPLEMENTED;
NOW THEREFORE BE IT
RESOLVED:
THAT CONSERVATION
APPLICATION #S08-315, FOR CORRECTIVE ACTION ACTIVITIES FOR COMPLETION OF CONSTRUCTION A NEW SINGLE-FAMILY RESIDENCE
AND OUTSTANDING MITIGATION WORK ADJACENT TO A WETLAND AND WATERCOURSE BE
GRANTED TO JOSEPH TARZIA FOR PROPERTY AT 74 CRANBURY ROAD, NORWALK, CT,
[DISTRICT 5, BLOCK 30, TAX LOT 20] WITH THE FOLLOWING MODIFICATIONS:
1.
THAT THE FLOOD MITIGATION AREA, AS INDICATED ON PLANS DATED
JANUARY 12, 2007 BY MCCHORD ENGINEERING, BE PLANTED WITH TEN (10) NATIVE SHRUBS
AND A GROUND COVER, WHICH MUST BE APPROVED BY THE SENIOR ENVIRONMENTAL
OFFICER. THE ABOVE-DESCRIBED LANDSCAPING
SHALL BE CONSIDERED PART OF THE WETLAND MITIGATION PLANTING PLAN;
2.
THAT THE DRIVEWAY, WALKWAY AND PATIO BE CONSTRUCTED WITH
“ECOSTONE” PERVIOUS PAVERS OR APPROVED SUBSTITUTE; AND
3.
THAT THE PATIO BE REDUCED TO A MAXIMUM DIMENSION OF 10 FEET WIDE BY 25 FEET LONG.
BE
IT FURTHER RESOLVED:
THAT THE FOLLOWING SPECIAL AND GENERAL
CONDITIONS APPLY:
1.
THE PORTION OF THE SUBMITTED BOND HELD FOR PLANTING
($2,750.00) SHALL BECOME ELIGIBLE FOR RELEASE FOLLOWING TWO (2) FULL GROWING
SEASONS, AFTER THE SEASON OF INITIAL PLANTING.
A GROWING SEASON EXTENDS FROM MAY 15 THROUGH OCTOBER 15 OF ANY GIVEN
YEAR. OTHER PORTIONS OF THE BOND ARE ELIGIBLE FOR RELEASE AS THE WORK IS
COMPLETED AND THE SITE IS STABILIZED. ALL SPECIAL CONDITIONS OF THE PERMIT MUST
BE SATISFIED PRIOR TO RELEASE OF THE BOND.
2.
PRIOR TO COMMENCEMENT OF ANY ON-SITE PERMIT RELATED
ACTIVITY, THE APPLICANT SHALL PROVIDE PHOTO DOCUMENTATION OF THE SITE AND
CROSS-REFERENCE THE PHOTOGRAPHS ON A SITE PLAN.
PHOTOGRAPHS SHOULD REPRESENT WIDE-ANGLE VIEWS.
3.
SILT FENCE OR HAY BALES SHALL BE INSTALLED IN THE LOCATION
INDICATED ON THE SITE PLAN ENTITLED “PROPOSED RESIDENCE, REVISED SITE PLAN”,
DATED 09-28-04 AND LAST REVISED 03-02-05 BY DEAN MARTIN, GRUMMAN ENGINEERING
LLC. THE SILT FENCING IS TO BE PROPERLY
INSTALLED, AND THEN CHECKED BY THE CONSERVATION STAFF, PRIOR TO THE
COMMENCEMENT OF ANY WORK ON SITE.
4.
THE SILT FENCE SHALL REMAIN IN THE ORIGINAL APPROVED
LOCATION IN SPECIAL CONDITION #3 UNTIL JUST PRIOR TO THE COMMENCEMENT OF
GRADING FOR THE FLOOD MITIGATION WORK.
PRIOR TO THIS WORK, SILT FENCE SHALL BE INSTALLED IN THE LOCATION
INDICATED ON THE PLAN ENTITLED, “REVISED SITE GRADING PLAN, 74 CRANBURY ROAD”,
DATED JANUARY 12, 2007, AS PREPARED BY MCCHORD ENGINEERING ASSOCIATES,
INC.
5.
NO CONSTRUCTION-RELATED ACTIVITY, INCLUDING, BUT NOT LIMITED
TO, STOCKPILING, CONSTRUCTION ACCESS, GRADING OR VEGETATION REMOVAL MAY OCCUR
6.
ALL SHRUBS THAT ARE PART OF THE WETLAND MITIGATION PLANTING
PLAN SHALL BE A MINIMUM OF 36 INCHES IN HEIGHT.
ALL TREES THAT ARE PART OF THE WETLAND MITIGATION PLANTING PLAN SHALL
HAVE A MINIMUM 2 ½ -INCH CALIPER AT THE TIME OF PLANTING. A DESIGNATED WETLAND & WATERCOURSE
BUFFER SHALL BE ESTABLISHED EASTWARD OF THE SILT FENCE LINE SHOWN ON THE PLAN
ENTITLED, “PROPOSED RESIDENCE, REVISED SITE PLAN”, DATED SEPTEMBER 28, 2004 AND
LAST REVISED APRIL 25, 2005 AS PREPARED BY GRUMMAN ENGINEERING LLC. ANY DISTURBED AREAS WITHIN THE DESIGNATED
WETLAND BUFFER, SUCH AS GRADING FOR FLOOD MITIGATION, SHALL BE SEEDED WITH A
NATIVE SEED MIX WITHIN TWO (2) DAYS OF DISTURBANCE. THE AREA WITHIN THE DESIGNATED WETLAND
BUFFER SHALL BE MAINTAINED IN SUCH A MANNER THAT ALLOWS THIS AREA TO ESTABLISH
A NATURAL VEGETATED STATE; THESE AREAS SHALL NOT BE MAINTAINED AS LAWN.
7.
THE WETLAND MITIGATION PLANTING PLAN AS SHOWN ON THE PLAN
ENTITLED “PROPOSED RESIDENCE REVISED SITE PLAN”, DATED SEPTEMBER 28, 2004 AND
LAST REVISED APRIL 25, 2005 BY
GRUMMAN ENGINEERING LLC, SHALL BE FULLY IMPLEMENTED WITHIN THREE (3) MONTHS
OF THE ISSUANCE OF THIS CORRECTIVE ACTION PERMIT.
8.
THE APPLICANT SHALL CAUSE TO BE PREPARED AN ‘AS-BUILT’
FOUNDATION SURVEY OF THE PROPERTY. THE
‘AS-BUILT’ SURVEY SHALL ALSO INCLUDE ALL WETLANDS AND WATERCOURSES, THE
100-YEAR FLOOD ZONE LINE, THE FLOODWAY LINE, THE AREA PREVIOUSLY DESCRIBE IN
SPECIAL CONDITION #5 ABOVE NOTED AS THE ‘DESIGNATED WETLAND BUFFER AREA’, THE
LIMIT OF DESIGNATED WETLAND BUFFER AREA NOTED AS THE ‘LIMIT OF LAWN’, THE FLOOD
MITIGATION AREA NOTED AS ‘FLOOD MITIGATION AREA - REQUIRED FOR FLOOD WATER
STORAGE’ AND A NOTE REFERRING THE READER TO THE CONSERVATION OFFICE FOR FURTHER
INFORMATION ASSOCIATED WITH CONSERVATION PERMIT #S05-215, #S05-215A AND #S08-315. THE ‘AS-BUILT’ PLAN SHALL BE FILED ON THE
WHEN THE PROPERTY IS TRANSFERRED
FROM THE DEVELOPER TO NEW OWNER, EITHER A REDUCED COPY OF THIS MAP SHALL BE
ATTACHED TO THE WARRANTY DEED OR THE WARRANTY DEED SHALL REFER TO THE MAP
NUMBER ASSIGNED BY THE TOWN CLERK TO THE ABOVE-DESCRIBED FILED SURVEY MAP.
IN THE EVENT THAT THE PROPERTY IS
SOLD PRIOR TO THE ‘AS-BUILT” SURVEY BEING AVAILABLE, A REDUCED COPY OF THE
APPROVED SITE PLAN, ENTITLED “PROPOSED RESIDENCE REVISED SITE PLAN”, DATED
09-28- 04 AND LAST REVISED 03-02-05 BY DEAN MARTIN, GRUMMAN ENGINEERING LLC,
SHALL BE ATTACHED, AS A REDUCED COPY, TO THE WARRANTY DEED.
NO PORTION OF THE PERFORMANCE BOND SHALL BE
RELEASED UNTIL THIS CONDITION IS SATISFIED.
9.
THIS CORRECTIVE ACTION PERMIT ALLOWS FOR THE CONTINUANCE OF
ACTIVITIES PREVIOUSLY PERMITTED UNDER AN EXPIRED PERMIT. ALL REGULATED ACTIVITIES OF THE PROPOSED PLAN
MUST BE COMPLETED WITHIN ONE (1) YEAR OF THE ISSUANCE OF THIS PERMIT.
10. THIS PERMIT DOES NOT COVER
ANY SEWER LATERAL CONNECTIONS WITH THE PROPOSED FORCE
11. ANY CHANGE TO THE OVERALL
PLAN, AS DEPICTED IN PLANS ENTITLED “PROPOSED RESIDENCE, REVISED SITE PLAN”,
DATED 09-28-04, LAST REVISED 03-02-05, AND “PROPOSED LOW PRESSURE FORCE MAIN
PLAN”, DATED 09-28-04 AND LAST REVISED 12-29-04 BY GRUMMAN ENGINEERING LLC,
WILL REQUIRE A RETURN TO THE CONSERVATION COMMISSION FOR REVIEW.
12. THE SPECIES OR VARIETY OF
LAWN GRASS SHALL BE A TYPE THAT IS APPROPRIATE FOR THE SITE, SO THAT LAWN CARE
PRACTICES MAY BE MINIMIZED. THE LAWN
GRASS VARIETY SHALL BE APPROVED BY THE SENIOR ENVIRONMENTAL OFFICER PRIOR TO
IMPLEMENTATION.
** MS. WILSON SECONDED.
** MOTION CARRIED.
V.
PUBLIC HEARING
Mr.
Hubbard noted that it was 7:00 p.m. and that the public hearings would begin.
a)
#S08-312—Rowayton
Woods Drive—Organic Designs, LLC—Pond rehabilitation and drainage improvements
in and adjacent to a wetland and watercourse (continuation of Public hearing commenced
May 13, 2008.
Mr. Hubbard opened the public hearing
and explained the public hearing proceedure.
Ms. Cherichetti stated that this public
hearing was a continuation of the one begun on May 13, 2008. Mr. Hubbard explained that the public hearing
had been held open to allow further examination of statement by a member of the
public that an agreement between adjacent property owners and the Condominium
prohibited drainage work on the portion of the property. Mr. Hubbard stated that he read the agreement
filed on the Norwalk Land Records and saw no impediment to the applicant’s
proposal. Ms. Cagnina agreed.
** MS.
CAGNINA MADE A MOTION TO CLOSE THE PUBLIC HEARING.
** MS.
DESTEFANIS SECONDED THE MOTION.
** THE
MOTION CARRIED UNANIMOUSLY.
b)
#S07-309—
Ms. Cherichetti explained that the
applicant failed to send notice to the abutting property owners. She added that the applicant’s had granted
the Commission an extension of time to deliberate the application.
Mr. Hubbard stated that the hearing
would be adjourned to the regular meeting of June 10, 2008.
VI.
DISCUSSION
AND/OR DECISION (continued)
f)
#S08-317—
** MR. HANDRINOS MOVED TO ADOPT THE FOLLOWING
RESOLUTION:
WHEREAS, THE CONSERVATION COMMISSION HAS CAREFULLY
CONSIDERED ALL THE INFORMATION SUBMITTED AND THE FACTORS FOR
CONSIDERATION OF DECISION, AS DETAILED IN SECTION 60A-8 OF
WHEREAS, THE PROPOSED ACTIVITIES HAVE PREVIOUSLY BEEN
APPROVED UNDER CONSERVATION PERMIT #S05-208 AND THIS PERMIT HAS EXPIRED; AND
WHEREAS, PERMIT #S05-208 WAS APPROVED WITH CONDITIONS
AND SOME OF THESE REQUIRED CONDITIONS HAVE NOT YET BEEN IMPLEMENTED;
NOW THEREFORE BE IT RESOLVED:
THAT CONSERVATION APPLICATION #S08-317, FOR
CORRECTIVE ACTION ACTIVITIES FOR COMPLETION OF CONSTRUCTION A NEW SINGLE-FAMILY
RESIDENCE AND OUTSTANDING MITIGATION WORK ADJACENT TO A WETLAND AND
WATERCOURSE, BE GRANTED TO RALPH JR. AND CLAIRE ARCAMONE FOR PROPERTY AT 145
WEST NORWALK ROAD, NORWALK, CT, [DISTRICT 5, BLOCK 62, TAX LOT 238] WITH THE
FOLLOWING MODIFICATIONS AND CONDITIONS:
1. THE PORTION OF THE
PREVIOUSLY SUBMITTED BOND ($5,600.00) HELD FOR PLANTING ($2,750.00) SHALL
BECOME ELIGIBLE FOR RELEASE FOLLOWING AT LEAST ONE FULL YEAR, INCLUDING ONE (1)
FULL GROWING SEASON, AFTER THE SEASON OF INITIAL PLANTING. A GROWING SEASON EXTENDS FROM MAY 15 THROUGH
OCTOBER 15 OF ANY GIVEN YEAR. OTHER PORTIONS OF THE BOND ARE ELIGIBLE FOR
RELEASE AS THE WORK IS COMPLETED AND THE SITE IS STABILIZED. ALL SPECIAL CONDITIONS OF THE PERMIT MUST BE
SATISFIED PRIOR TO RELEASE OF THE BOND.
2. PRIOR TO COMMENCEMENT OF
ANY ON-SITE PERMIT RELATED ACTIVITY, THE APPLICANT SHALL PROVIDE PHOTO
DOCUMENTATION OF THE SITE AND CROSS-REFERENCE THE PHOTOGRAPHS ON A SITE
PLAN. PHOTOGRAPHS SHOULD REPRESENT
WIDE-ANGLE VIEWS.
3. THE SITE PLAN ENTITLED,
“SITE PLAN”, DATED 11-17-04 AND LAST REVISED 02-02-05 BY DONALD STRAIT, GRUMMAN
ENGINEERING LLC, SHALL BE MODIFIED TO MOVE THE LEVEL SPREADER AT THE FOOTING
OUTLET TO A LOCATION AT LEAST FORTY (40) FEET FROM THE WETLAND LIMIT LINE. IN THIS LOCATION, THE SILT FENCE SHALL ALSO
BE MOVED SO THAT IT IS AT LEAST FORTY (40) FEET FROM THE WETLAND LINE.
4. SILT FENCE OR HAY BALES
SHALL BE INSTALLED, WITH THE EXCEPTION NOTED ABOVE, IN THE LOCATION INDICATED
ON THE SITE PLAN ENTITLED “SITE PLAN”, DATED 11-17-04 AND LAST REVISED 02-02-05
BY DONALD STRAIT, GRUMMAN ENGINEERING LLC.
TREE PROTECTION AND SILT FENCING IS TO BE PROPERLY INSTALLED, AND THEN
CHECKED BY THE CONSERVATION STAFF, PRIOR TO THE COMMENCEMENT OF ANY WORK ON
SITE.
5. NO CONSTRUCTION-RELATED
ACTIVITY, INCLUDING, BUT NOT LIMITED TO, STOCKPILING, CONSTRUCTION ACCESS,
GRADING OR VEGETATION REMOVAL MAY OCCUR
6. ALL SHRUBS THAT ARE PART OF
THE WETLAND MITIGATION PLANTING PLAN SHALL BE A MINIMUM OF 36 INCHES IN
HEIGHT. ADDITIONALLY, FIFTEEN (15)
ADDITIONAL SHRUBS, OF ANY HEIGHT, SHALL BE PLANTED BETWEEN THE DRIVEWAY AND
WETLAND NEAR
7. THE WETLAND MITIGATION
PLANTING PLAN AS SHOWN ON THE PLAN ENTITLED “SITE PLAN”, DATED 11-17-04 AND LAST
REVISED 02-02-05 BY GRUMMAN ENGINEERING LLC AND AS AMENDED BY #6 ABOVE, SHALL
BE FULLY IMPLEMENTED WITHIN THREE (3) MONTHS OF THE ISSUANCE OF THIS CORRECTIVE
ACTION PERMIT.
8. THE APPLICANT SHALL CAUSE
TO BE PREPARED AN ‘AS-BUILT’ FOUNDATION SURVEY OF THE PROPERTY. THE ‘AS-BUILT’ SURVEY SHALL ALSO INCLUDE ALL
WETLANDS AND WATERCOURSES, THE AREA BETWEEN THE LIMIT OF DISTURBANCE AND THE
WETLAND NOTED AS THE ‘DESIGNATED WETLAND BUFFER AREA’, THE LIMIT OF DISTURBANCE
LINE NOTED AS THE ‘LIMIT OF LAWN AND A NOTE REFERRING THE READER TO THE
CONSERVATION OFFICE FOR FURTHER INFORMATION ASSOCIATED WITH CONSERVATION PERMIT
#S05-208. THE ‘AS-BUILT’ PLAN SHALL BE
FILED ON THE
IF AND WHEN THE PROPERTY IS TRANSFERRED FROM THE
APPLICANT TO A NEW OWNER, EITHER A REDUCED COPY OF THIS MAP SHALL BE ATTACHED
TO THE WARRANTY DEED OR THE WARRANTY DEED SHALL REFER TO THE MAP NUMBER
ASSIGNED BY THE TOWN CLERK TO THE ABOVE-DESCRIBED FILED SURVEY MAP.
NO PORTION OF THE PERFORMANCE BOND SHALL BE RELEASED
UNTIL THE FIRST PARAGRAPH OF THIS CONDITION IS SATISFIED.
9. THE DRIVEWAY SHALL NOT HAVE
CURBS AND SHALL BE DESIGNED SO THAT STORM WATER DRAINAGE SHEET FLOWS ACROSS THE
ADJACENT BUFFER.
10. THIS CORRECTIVE ACTION
PERMIT ALLOWS FOR THE CONTINUANCE OF ACTIVITIES PREVIOUSLY PERMITTED UNDER AN
EXPIRED PERMIT. ALL REGULATED ACTIVITIES
OF THE PROPOSED PLAN MUST BE COMPLETED WITHIN ONE AND A HALF (1 1/2 ) YEARS OF
THE ISSUANCE OF THIS PERMIT.
11. ANY CHANGE TO THE OVERALL
PLAN, AS DEPICTED IN PLANS ENTITLED “SITE PLAN”, DATED 11-17-04, LAST REVISED
02-02-05, BY GRUMMAN ENGINEERING LLC, WILL REQUIRE A RETURN TO THE CONSERVATION
COMMISSION FOR REVIEW.
** MS. DESTEFANIS SECONDED.
** MOTION PASSED UNANIMOUSLY.
g)
#S08-318-351
West Cedar Street-James—New permit for construction of a single-family
residence adjacent to a wetland and watercourse due to Permit Expiration of
#S04-204
The Commission agreed that the property
was on
** MS. CAGNINA MOVED TO ADOPT THE
FOLLOWING RESOLUTION:
WHEREAS, THE CONSERVATION COMMISSION HAS CAREFULLY
CONSIDERED ALL THE INFORMATION SUBMITTED AND THE FACTORS FOR
CONSIDERATION OF DECISION, AS DETAILED IN SECTION 60A-8 OF
WHEREAS, THE PROPOSED ACTIVITIES HAVE PREVIOUSLY BEEN
APPROVED UNDER CONSERVATION PERMIT #S04-204 AND THIS PERMIT HAS EXPIRED; AND
WHEREAS, PERMIT #S04-204 WAS APPROVED WITH CONDITIONS
AND SOME OF THESE REQUIRED CONDITIONS HAVE NOT YET BEEN IMPLEMENTED;
NOW THEREFORE BE IT RESOLVED:
THAT CONSERVATION APPLICATION #S08-318, FOR
CORRECTIVE ACTION ACTIVITIES FOR COMPLETION OF CONSTRUCTION A NEW SINGLE-FAMILY
RESIDENCE AND OUTSTANDING MITIGATION WORK ADJACENT TO A WETLAND AND
WATERCOURSE, BE GRANTED TO ANDREW JAMES FOR PROPERTY AT 349 WEST CEDAR STREET,
NORWALK, CT, [DISTRICT 5, BLOCK 69, TAX LOT 12] WITH THE FOLLOWING MODIFICATIONS
AND CONDITIONS:
1.
THE PREVIOUSLY POSTED $3,000.00 BOND SHALL BECOME ELIGIBLE
FOR RELEASE FOLLOWING TWO (2) FULL GROWING SEASONS, AFTER THE SEASON OF INITIAL
PLANTING. A GROWING SEASON EXTENDS FROM
MAY 15 THROUGH OCTOBER 15 OF ANY GIVEN YEAR.
ALL CONDITIONS OF THE PERMIT MUST BE SATISFIED PRIOR TO RELEASE OF THE
BOND.
2.
PRIOR TO COMMENCEMENT OF ANY ON-SITE PERMIT RELATED
ACTIVITY, THE APPLICANT SHALL PROVIDE PHOTO DOCUMENTATION OF THE SITE AND
CROSS-REFERENCE THE PHOTOGRAPHS ON A SITE PLAN.
PHOTOGRAPHS SHOULD REPRESENT WIDE-ANGLE VIEWS.
3.
SILT FENCE OR HAY BALES SHALL BE INSTALLED IN THE LOCATIONS
DEPICTED ON THE PLAN ENTITLED, “LOT B SITE PLAN”, DATED 8-25-04 AND LAST
REVISED 11-16-04 BY GRUMMAN ENGINEERING LLC.
THE SILT FENCING IS TO BE PROPERLY INSTALLED, AND THEN CHECKED BY THE
CONSERVATION STAFF, PRIOR TO THE COMMENCEMENT OF ANY WORK ON SITE.
4.
NO CONSTRUCTION-RELATED ACTIVITY, INCLUDING, BUT NOT LIMITED
TO, STOCKPILING, CONSTRUCTION ACCESS, GRADING OR VEGETATION REMOVAL MAY OCCUR
BEYOND THE SILT FENCE, WHICH SHALL BE CONSIDERED THE LIMIT OF DISTURBANCE
UNLESS SPECIFICALLY EXEMPTED BY CONDITIONS OF THIS PERMIT.
5.
AS PREVIOUSLY DISCUSSED WITH THE PERMITTEE, THE DEPTH OF THE
GARAGE SHALL BE REDUCED BY FIVE (5) FEET AND THE ENTIRE HOUSE FOOTPRINT SHALL
BE PULLED NORTH (TOWARDS
6.
THE TWENTY- THREE (23) SHRUBS THAT ARE PART OF THE WETLAND
MITIGATION PLANTING PLAN SHALL BE A MINIMUM OF 36 INCHES IN HEIGHT. A DESIGNATED WETLAND BUFFER SHALL BE
ESTABLISHED WITHIN THE FIRST TWENTY (20) FEET ADJACENT TO THE WETLAND LIMIT
LINE. THE AREA WITHIN THE DESIGNATED
WETLAND BUFFER SHALL BE MAINTAINED IN SUCH A MANNER THAT ALLOWS THIS AREA TO
ESTABLISH A NATURAL VEGETATED STATE; THESE AREAS SHALL NOT BE MAINTAINED AS
LAWN.
7.
PRIOR TO REMOVAL OF ANY INVASIVE SPECIES WITHIN THE WETLAND
OR DESIGNATED WETLAND BUFFER, THE PERMITTEE OR REPRESENTATIVE SHALL MEET WITH
CONSERVATION STAFF AT THE SITE TO FURTHER DEFINE THE LIMITS OF THIS ACTIVITY.
8.
THE WETLAND MITIGATION PLANTING PLAN, INCLUDING THE PROPOSED
MANAGEMENT OF INVASIVE SPECIES, SHALL BE FULLY IMPLEMENTED WITHIN SIX (6)
MONTHS OF THE ISSUANCE OF THIS CORRECTIVE ACTION PERMIT.
9.
THE APPLICANT SHALL CAUSE TO BE PREPARED AN ‘AS-BUILT’
FOUNDATION SURVEY OF THE PROPERTY. THE
‘AS-BUILT’ SURVEY SHALL ALSO INCLUDE ALL WETLANDS AND THE AREA BETWEEN THE
LIMIT OF DISTURBANCE AND THE WETLAND LIMIT LINE NOTED AS THE ‘DESIGNATED
WETLAND BUFFER AREA’, THE LIMIT OF DISTURBANCE LINE NOTED AS THE ‘LIMIT OF LAWN’,
AND A NOTE REFERRING THE READER TO THE CONSERVATION OFFICE FOR FURTHER
INFORMATION ASSOCIATED WITH CONSERVATION PERMIT #S04-204. THE ‘AS-BUILT’ PLAN SHALL BE FILED ON THE
WHEN THE PROPERTY IS TRANSFERRED FROM THE DEVELOPER
TO NEW OWNER, EITHER A REDUCED COPY OF
THIS MAP SHALL BE ATTACHED TO THE WARRANTY DEED OR THE WARRANTY DEED
SHALL REFER TO THE MAP NUMBER ASSIGNED BY THE TOWN CLERK TO THE ABOVE-DESCRIBED
FILED SURVEY MAP.
IN THE EVENT THAT THE PROPERTY IS SOLD PRIOR TO THE
‘AS-BUILT” SURVEY BEING AVAILABLE, A REDUCED COPY OF THE APPROVED SITE PLAN,
ENTITLED “LOT B SITE PLAN”, DATED 8-25-04 AND LAST REVISED 11-16-04, BY GRUMMAN
ENGINEERING LLC, SHALL BE ATTACHED, AS A REDUCED COPY, TO THE WARRANTY DEED.
NO PORTION OF THE PERFORMANCE BOND SHALL BE RELEASED
UNTIL THIS CONDITION IS SATISFIED.
10. THIS CORRECTIVE ACTION PERMIT ALLOWS FOR THE CONTINUANCE OF ACTIVITIES PREVIOUSLY P